Daxing Airport Express in Beijing
Daxing Airport Express of the Beijing Subway (Chinese: 北京地铁大兴机场线; pinyin: Běijīng Dìtiě Dàxīng Jīchǎng Xiàn) is an airport rail link from Caoqiao (located at the Southern 3rd Ring Road) to the Beijing Daxing International Airport. It is colored blue on subway maps. The line opened on September 26, 2019.
It is one of two lines connecting the urban area of Beijing to the Beijing Daxing International Airport. The other line is the Beijing–Xiong’an intercity railway, a high-speed rail operated by China Railway.
Description
- Phase 1
Phase 1 of the line is 41.36 km, including 17.71 km of elevated track and 23.65 km of underground track. All stations are underground.
- Phase 2 (Northern extension)
A 3.5 km northern extension to Lize Business District station is currently under construction. The extension is fully underground. The northern extension started construction in 2020 and will be completed in 2022.
Fare
Ordinary Class one-way fare is ¥10, ¥25 or ¥35 (see below) and Business Class one-way fare is ¥50.
Lize Business District (under construction) | |||
---|---|---|---|
10 | Caoqiao | ||
10 | 10 | Daxing Xincheng | |
35 | 35 | 25 | Daxing Airport |
Rolling stock
The train sets of Daxing Airport Express are built by CRRC Qingdao Sifang.
8 Car Train
← Caoqiao
Daxing Airport →
|
||||||||
Car No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
---|---|---|---|---|---|---|---|---|
Designation | Tc | M | Tp | M | M | Tp | M | Xc |
Numbering | JC 0xx1 | JC 0xx2 | JC 0xx3 | JC 0xx4 | JC 0xx5 | JC 0xx6 | JC 0xx7 | JC 0xx8 |
- Car 7 is a business class car.
- Car 3 has a wheelchair space.
- Car 8 is a baggage car.
4 Car Train
← Caoqiao
Daxing Airport →
|
||||
Car No. | 1 | 2 | 3 | 4 |
---|---|---|---|---|
Designation | Tc | Mp | Mp | Tc |
Numbering | JC 4xx1 | JC 4xx2 | JC 4xx3 | JC 4xx4 |
- Car 4 is a business class car.
- Car 3 has a wheelchair space.
Stations
Section | Station Name | Connections | Nearby bus stops | Distance km[15] |
Location | |||
---|---|---|---|---|---|---|---|---|
English | Chinese | |||||||
Phase 2 (Northern extension)[10] | Lize Business District | 丽泽商务区 | Fengtai | Beijing | ||||
Phase 1 | Caoqiao | 草桥 | 10 | 381 410 423 434 456 483 497 529 676 679 夜22 专179 | 0.000 | 0.000 | ||
Daxing Xincheng | 大兴新城 | 946 | 13.028[15] | 13.028 | Daxing | |||
Daxing Airport | 大兴机场 | Jingxiong PKX |
25.303[15] | 38.331 | Guangyang | Langfang, Hebei Province |
||
Long-term planning | Daxing Airport South | 大兴机场南 | Daxing | Beijing | ||||
History
The Daxing Airport Express was originally planned to start from Mudanyuan, and be routed in parallel with Line 19 from Mudanyuan to Caoqiao. However, the plan would cost more than 40 billion yuan, which was considered too expensive for a dedicated line that would only serve passengers going to and from the airport. The parallel section with Line 19 was abandoned and the routed was shortened to the stretch from Caoqiao to Daxing Airport. The investment required for the line was reduced by 20 billion yuan.
In 2014, it was reported that the government was going to invest 19.7 billion yuan in the Daxing Airport Express and a plan with 4 stations: Caoqiao, Daxing Xincheng, and two stations at the Daxing Airport.
In early 2016, it was announced that the Daxing Airport Express was slated for completion by 2019. Phase I of the line includes only 3 stations: Caoqiao, Daxing Xincheng and Daxing Airport. The line will operate at a top speed of 160 km/h (99 mph) using Type D rolling stock, which is fully automated.[20] Construction started at the end of 2016.
Test runs on the line began in June 2019, and the line was opened on September 26, 2019 (Phase 1).
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Caoqiao — Daxing Airport | 26 September 2019 | 41.36 km (25.70 mi) | 3 | Phase I |
Future expansion
A northern extension to Lize Business District station is under construction, with a length of 3.5 km. The extension will be fully underground, and will bring the line to a total of 44.86 km. The northern extension started construction in 2020[10] and will be completed in 2022.
A southern extension to Daxing Airport South is also planned in long term planning.
Line R1 of Xiong’an Rail Transit will through-operate with Daxing Airport Express.